Skip to content
SENAPATHI Report

Front monitor

Skyward Front · Air, Space & Missiles

Watch

Squadron arithmetic worsening while fighter programmes fight engine and technology-transfer bottlenecks — nearly 30 engineless Tejas Mk1A airframes now ride on GE's promised 20 F404s by December; missiles, military space and layered air defence remain the momentum stories, with the 2018 S-400 contract reportedly closing in November.

Standing watch on India's aerospace power: the IAF is holding at roughly 29 fighter squadrons against a sanctioned 42 — a six-decade low after the MiG-21's September 2025 retirement — while every recapitalisation track fights its own battle. Tejas Mk1A deliveries remain hostage to GE F404 engine supply, the 114-jet MRFA/Rafale buy is stalled on source-code and ICD access, and AMCA's engine tracks are split between a tripled F414 quote and a Safran–Rolls-Royce co-development contest. The missile and space legs are moving faster: a second Agni-5 MIRV test in May 2026, a Mach-8 ET-LDHCM hypersonic test under Project Vishnu, the ₹26,968-crore 52-satellite SBS-3 constellation under the Defence Space Agency, and an air-defence build-out spanning the fourth S-400 squadron, a cleared follow-on S-400 order and Project Kusha.

Updated 12 Jul 2026 · updates logged below as they happen

Changelog

What's happened

  1. A single-source report says the fifth and final S-400 squadron will arrive in November 2026, which would close out the $5.43-billion five-squadron contract signed with Russia in October 2018 after years of Ukraine-war delivery delays; neither government has confirmed the date.

    Our coverage → source ↗

  2. GE Aerospace hands over the seventh F404-IN20 engine to HAL — the first since 2 April — while close to 30 completed Tejas Mk1A airframes wait for powerplants; GE's promised batch of 20 engines by December 2026 is now the pacing item for first IAF deliveries by late 2026.

    Our coverage → source ↗

  3. Ten Indian firms submit bids for the IAF's 87-UAV tender worth over ₹30,000 crore — one of India's largest unmanned-systems competitions and a bellwether for the private drone industrial base.

    Our coverage → source ↗

  4. DAC clears capital acquisition proposals worth about ₹52,000 crore with a counter-drone and layered air-defence tilt — including MRSAM, VSHORADS, the 'Akash Tarang' anti-UAV system and a fixed-wing High Altitude Pseudo Satellite for the IAF.

    Our coverage → source ↗

  5. Safran and Rolls-Royce submit final competing offers to co-develop the AMCA Mk2 engine, each pledging 100% technology transfer — the decision that will determine whether India closes its fighter-engine design gap.

    Our coverage → source ↗

  6. GE's reported ~300% price increase on the F414 stalls engine talks for AMCA prototypes and clouds Tejas Mk2 timelines, reviving the debate over dependence on American fighter engines.

    Our coverage → source ↗

  7. A delivered GE F404 engine develops a snag and another fails acceptance parameters with just 6 of 99 engines received; MoD orders a comprehensive September review of the Tejas Mk1A programme, now over two years behind schedule.

    Our coverage → source ↗

  8. Modi-Macron talks in Nice leave the 114-jet MRFA/Rafale deal unresolved: India's Letter of Request went to France in late May, but access to source code and the Interface Control Document — needed to integrate Indian weapons independently — remains the sticking point.

    source ↗

  9. The fourth S-400 'Sudarshan' squadron arrives in India after prolonged delivery delays, with the fifth and final squadron under the 2018 contract expected by end-2026; the DAC cleared five follow-on squadrons in March.

    source ↗

  10. India conducts its second acknowledged MIRV flight test of an advanced Agni-5 from Dr APJ Abdul Kalam Island, deploying multiple independently targetable re-entry vehicles across separated impact zones.

    source ↗

4 tagged stories

Coverage