Front monitor
Skyward Front · Air, Space & Missiles
Watch Squadron arithmetic worsening while fighter programmes fight engine and technology-transfer bottlenecks — nearly 30 engineless Tejas Mk1A airframes now ride on GE's promised 20 F404s by December; missiles, military space and layered air defence remain the momentum stories, with the 2018 S-400 contract reportedly closing in November.
Standing watch on India's aerospace power: the IAF is holding at roughly 29 fighter squadrons against a sanctioned 42 — a six-decade low after the MiG-21's September 2025 retirement — while every recapitalisation track fights its own battle. Tejas Mk1A deliveries remain hostage to GE F404 engine supply, the 114-jet MRFA/Rafale buy is stalled on source-code and ICD access, and AMCA's engine tracks are split between a tripled F414 quote and a Safran–Rolls-Royce co-development contest. The missile and space legs are moving faster: a second Agni-5 MIRV test in May 2026, a Mach-8 ET-LDHCM hypersonic test under Project Vishnu, the ₹26,968-crore 52-satellite SBS-3 constellation under the Defence Space Agency, and an air-defence build-out spanning the fourth S-400 squadron, a cleared follow-on S-400 order and Project Kusha.
Updated 12 Jul 2026 · updates logged below as they happen